Assessment 3: Project management plan for QRP & Presentation
Assessment Details:
This assessment requires students to analyse a real-life project (either ongoing or completed) to develop and writer QRP
plan. Student can select project in their field of interest, but project must be aligned with the discipline of project
management. This assessment also requires student present the QRP plan as a separate presentation. For this purpose,
student can use digital media (such as Power point with embedded voice/video) to record their presentation. Both
components of the assessment must be submitted in Canvas using assignment submission link for final marking.
Following resources may assist student in selecting a real-life project:
• • The Australian Government’s Department Infrastructure and Transport. National Infrastructure Construction
Schedule (NICS): https://www.nics.gov.au/Project
• • Transport for UNSW: https://www.transport.nsw.gov.au/projects
• • City of Sydney, Changing urban precincts: http://www.cityofsydney.nsw.gov.au/vision/changing-urban-precincts
Marking Criteria and Rubric: The assessment will be marked out of 100 and will be weighted 35% of the total unit
mark and consist of two parts: Written and Presentation.
Rubrics for written part (Report: Maximum marks possible is 67):
Rubrics for presentation part (Oral presentation: Maximum marks possible is 33):