MKAE1083: A Footbridge Is Required To Provide Communication Between Residential Areas On Either Side Of A Dual Carriageway Road: Reinforced Concrete Assignment, UTM, Malaysia
University | Universiti Teknologi Malaysia (UTM) |
Subject | MKAE1083: Reinforced Concrete |
GET SOLUTION OF THIS PAPER AT https://bestwriters.org/dashboard/orders/create
A footbridge is required to provide communication between residential areas on either side of a dual carriageway road. The road is in cutting as shown in the accompanying cross-section. Two carriageways and two verges with footpaths are symmetrically disposed about a central reservation.
In-situ semi-continuous reinforced concrete construction is specified by the
consultant and closure of the carriage is to be kept minimum or avoided completely.
The construction is to be carried out in two phases, each consisting of one-half of the footbridge, from the approach point to the middle of the central reservation. The corresponding carriageway will be
closed, and traffic is to be diverted to another carriageway.
GET SOLUTION OF THIS PAPER AT https://bestwriters.org/dashboard/orders/create
- Suggest suitable structural form and layout for the bridge deck, and supports, illustrating proposals in a neat sketch.
- Adopt suitable material strengths and estimate preliminary concrete sizes for principal elements of the bridge superstructures.
- Design the reinforcement required in all structural elements of the footbridge.
- The slab
- The main and secondary beams
- A column that carries the largest action
- A footing for the column
- Prepare neat scale sketches showing the arrangement of reinforcement