Quarry Road Project
<insert name>
Please read the coursework briefing document before attempting to complete
Contents
SECTION A.1 – Time location Analysis 3
SECTION A.2 – Time location Analysis assumptions 5
SECTION B – Sub-contractor schedule (derived from Time Location analysis) 6
SECTION C – Work Breakdown structure diagram 7
SECTION D.1 – A fully resourced and costed Programme of Works for the Accommodation Bridge construction 8
SECTION D.2 –Programme of Works for the Accommodation Bridge construction – assumptions, cost, resource and precedence details 9
SECTION E – A cumulative cashflow for the bridge construction 10
SECTION F – reply to the Client requesting this outstanding information, including specific clauses within the NEC4 ECC supporting this request 11
SECTION G – Compensation Event notification to the Project Manager 12
SECTION H – Description of process and relevant clauses in the NEC4 ECC as per coursework brief 13
To Update page numbers when you have finished > right click table above>select update field > click OK.
SECTION A.1 – Time location Analysis
Options for completion:
- Print the below sheet in A3 and complete by hand. Scan/photo and submit with the template
- Complete your own version of the sheet below by hand, including analysis. Scan/photo and submit with the template
- Use the drawing tools in MS Word (insert>shapes) to directly complete your analysis on this template
Location► ◄ Time | ||||||||||||||
Location► ◄ Time | ||||||||||||||
SECTION A.2 – Time location Analysis assumptions
List your assumptions here:
SECTION B – Sub-contractor schedule (derived from Time Location analysis)
SECTION C – Work Breakdown structure diagram
This is for the accommodation bridge part of the works
SECTION D.1 – A fully resourced and costed Programme of Works for the Accommodation Bridge construction
This must be submitted as a MS Project 2016 or Project 365 document. Please reference this here and submit the file in the submission folder.
SECTION D.2 –Programme of Works for the Accommodation Bridge construction – assumptions, cost, resource and precedence details
List your assumptions here and insert any tables/data you have created.
SECTION E – A cumulative cashflow for the bridge construction
This is to be extracted from the MS Project file and formatted appropriately.