For faster services, inquiry about  new assignments submission or  follow ups on your assignments please text us/call us on +1 (251) 265-5102

WhatsApp Widget

ITP-5- Project Risk Assessment (Individual Project). Under the section “RISK MANAGEMENT OVERVIEW:” Please KEEP the 7 questions and answer them within the paper itself. Provide a table of Terminology on an Appendix (A or B). References provided already, but maybe edited. Times New Roman 12pt font, double spaced, APA. This entire paper is on the “Happy Tails Veterinary Clinic” and UMUC… The Executive Summary must stay basically the same. Team name & university name MUST stay the same. This is just a continuation of other projects and is the Risk Assessment Analysis phase of the project. I am attaching older copies from previous phases and the draft paper for this phase in which I have started. Please complete and return as soon as possible.

ITP-5- Project Risk Assessment (Individual Project).

Under the section “RISK MANAGEMENT OVERVIEW:” Please KEEP the 7 questions and answer them within the paper itself.

Provide a table of Terminology on an Appendix (A or B). References provided already, but maybe edited. Times New Roman 12pt font, double spaced, APA.

This entire paper is on the “Happy Tails Veterinary Clinic” and UMUC… The Executive Summary must stay basically the same. Team name & university name MUST stay the

same. This is just a continuation of other projects and is the Risk Assessment Analysis phase of the project.

I am attaching older copies from previous phases and the draft paper for this phase in which I have started.

Please complete and return as soon as possible.

REMEMBER: This paper only covers the RMA (Risk Assessment Analysis) phase and not and entire project management.

ITP-5 – Project Risk Assessment (Individual project)
(PMBOK 11) Addresses Course Outcomes #4c and 6e
IMPORTANT: FIRST, read the general introduction and instructions for the course-long Integrated Team Project (ITP) in Content.

Assignment for the ITP-5 Project Deliverable
Review your previous deliverables and the overview of the ITP posted in the Syllabus and in the previous project assignments.
Please remember that every assignment in this course follows APA format and must include a cover sheet.  In addition, as a senior-level course, the text document

should include a brief summary of the PURPOSE of the document and terms and discussion should be provided to ensure that the reader and the writer are on a common

level of understanding.
Then using your team’s ITP WBS, develop and submit a project risk register in MS Excel:
•      A project risk register, from the textbook, from the classroom material, from www.pmi.org, or from other valid research, that meets the following requirements.

.
•      In MS Excel, the risk register should be populated with the risks for at least 3 tasks of different types and categories at EACH level of the decomposition in

the WBS (no fewer than 12 tasks must have risks identified — 3 major tasks, 3 sub-tasks, 3 lowest level leaf node tasks or sub-sub tasks, and also at least 3 risks at

the overall project level (Level 0)).  (Note that this is minimum required, along with the other things below, to earn a satisfactory score.  To earn a better score,

you would want to include more risks at each level, and some of the additional things mentioned below.)
•         Risks may include, for example, technical IT risks, external risks that impact the project but which are outside the PM’s control, project management risks,

risks of project changes, and so forth.
•      Please note that a task could have more than one risk!  The risk register must include MITIGATION strategies to eliminate or minimize the risk (risk handling

procedures, mitigations) and contingency plans (what you will do if the risk happens).  If the format you are using does not include these columns, please add them,

then be clear on the difference between mitigation and contingency.  Address what aspect of the project will be affected by each mitigation action – cost, schedule, or

scope.  Provide a recommendation for whether or not the mitigation action should be implemented, remembering that EACH mitigation will impact the project’s scope, cost

or schedule.
•      The risk register should also include:
o    Title or description of item or TASK at risk.  (This is the WBS task in which the risk occurs, not the risk itself.)
o    Also include the WBS NUMBER to designate which WBS level the task is at.

o    Description of the RISK (What is the risk? What is at risk of happening?) (This identifies the nature of the risk itself, not the task.)
o    Risk category or type (e.g., technical risks, quality risks, financial risks, external risks, organization risks, project risks, quality risks, other risks, etc)
o    Consequences, impact, or cost at risk (adjectival or numeric)
o    Likelihood or probability (adjectival or numeric)
o    Initial risk score (or “risk product”, consequence times likelihood)
o    Risk handling category (avoidance, mitigation, transfer, acceptance, etc.)
o    Risk handling / control / action plan, including a column for each:
? The mitigation action that, if taken, would minimize the impact of the risk. (This is MANDATORY – how will you AVOID the risk??)
? cost and time to mitigate.
? Contingency plan – what the team will do if the risk actually happens (This is mandatory – what will you do to minimize harm if the risk happens?).
o    See the textbook for definitions and details
o    Designation of risk “owner” or risk manager (best designated by title or role rather than by individual’s name)
o     You should include such things as:
? Additional risks
? Risks for additional tasks
? Results of handling each risk after controls are implemented:
? Consequences or cost at risk (Mandatory)
? Likelihood or probability (Mandatory)
? Final risk score or product (consequence times likelihood) (Mandatory)
? Quantitative numerical consequences, probabilities, and risk scores (rather than subjective, qualitative, or adjectival assessments)
? Additional narrative discussion of each risk, handling method, etc.
? Total of all the risk scores (risk products) for the entire project after risk controls are implemented, in dollars.
Be sure to define terms, especially how you determined risk rankings and risk scores.
o    o    See the textbook for details
•      Also include some risks associated with the general ability to complete the project successfully.  (You might consider these risks at Level 0, the root level,

of the WBS, affecting the entire project.)
•      Finally, if you quantitatively calculated the risk product in those terms, then what is the total of all the initial risk scores (risk products) for the entire

project, in dollars.

Questions:  In an accompanying Word doc or text submission, answer the following questions:
1.    Which risks (and associated tasks) would be the most threatening to the success of the project and why? This discussion should be very specific to tasks and

their associated risks.
2.    Which top THREE mitigations (and associated tasks) and risk handling plans should be implemented, and why?  Remember that mitigation actions will affect cost,

schedule and/or scope – so discuss what can you AFFORD to do based on the likelihood and impact of the risk?
3.    What are the TOTAL impacts on cost, schedule and scope for the project if the recommended risk controls and mitigation actions are taken?  If you use costs, how

did you calculate the cost? Will the risk handling improve things or make them worse?  That is, will the project cost more and/or be less successful because of risk

handling, or will it cost less and/or be more successful because of risk handling?  How so?  Explain.
4.    How did you determine those costs and impacts?  Please describe. What is the benefit of mitigating risks that are identified for mitigation?
5.  If your project could only afford $20,000 for mitigation actions, which risks (identify associated tasks) would be implemented?
6.  If your project could only tolerate a 5 day delay related to mitigation actions, which risks (identify associated tasks) would be implemented?
7.  What would be the most expensive (time and or schedule) contingency action/plan?  Identify the associated task and explain why this contingency would be the most

expensive in terms of time or schedule.
Submit the document(s) in your Assignment Folder.

Approximate breakdown by areas include:
o    General: Structure, Format, Mechanics, Style (~5%)
o    Risk register (~84%)
o    Questions (~10%)

Rubrics and Grading for the ITP-5 Project Deliverable:
To earn 90-100% of the points available for this assignment –
The risk register meets the basic requirements. Identify at least 10 risks at each level of the WBS, including risks that affect the general ability to complete the

project successfully, major tasks of different types and categories, sub-tasks of different types and categories, risks of several different risk types and categories,

including external risks, financial risks, organization risks, PM risks, quality risks, technical risks, and other risk categories.  In addition, include such things

as:
•                     Multiple risks for single tasks
•                     Quantitative numerical consequences, probabilities, and risk scores (rather than subjective, qualitative, or adjectival assessments)
•                     Show risk assessment (probability, impact, and score) numerically (e.g., percentages, dollars, etc) rather than qualitatively.
•                     Additional narrative discussion of each risk, handling method, etc.
•                     Designation of risk “owner” or risk manager and why that person or functional position is the “owner”
•                     Total of all the risk scores (risk products) for the entire project after risk controls are implemented, in dollars.
•                     Also include some risks associated with the general ability to complete the project successfully.  (You might consider these risks at Level 0,

the root level, of the WBS, affecting the entire project.)
•                     Answer all the initial risk scores (risk products) for the entire project, in dollars.
Include the following risk info for ea. risk: Title or description of item or TASK at risk; Description of the RISK; Risk category or type; Initial assessment of

Consequences, impact, or cost at risk; initial likelihood or probability; Initial risk score (consequence x likelihood); Risk handling CATEGORY; Risk handling /

control / mitigation / action PLAN; Designation of risk “owner”; Risk results with/after controls / handling plans implemented (Consequences or cost with controls;

Likelihood or probability with controls; Final risk score (consequence x likelihood)).  Answer all questions, and include reference sources are used in the text and

included in a Reference page.  Show risk assessment (probability, impact, and score) numerically (e.g., percentages, dollars, etc) rather than qualitatively.
To earn 80-89% of the points available for this assignment –
Identify at least 6 risks at each level, including risks such as: the general ability to complete the project successfully; major tasks of different types and

categories; sub-tasks of different types and categories; lowest level leaf node tasks or sub-sub tasks of different types and categories.  Include risks of several

different risk types and categories, including risks such as: external risks,  financial risks,  organization risks,  PM risks,  quality risks,  technical risks,  and

other risk categories.  Include several different risk handling categories (avoidance, mitigation, transfer, acceptance).
Include most of the following risk info for ea. risk: Title or description of item or TASK at risk; Description of the RISK; Risk category or type; Initial assessment

of Consequences, impact, or cost at risk; initial likelihood or probability; Initial risk score (consequence x likelihood); Risk handling CATEGORY; Risk handling /

control / mitigation / action PLAN; Designation of risk “owner.  Answer all questions.
To earn 70-79% of the points available for this assignment –
Identify at least 3 risks at each level, including risks such as: the general ability to complete the project successfully; major tasks of different types and

categories; sub-tasks of different types and categories; lowest level leaf node tasks or sub-sub tasks of different types and categories.  Include risks of several

different risk types and categories, including risks such as: external risks,  financial risks,  organization risks,  PM risks,  quality risks,  technical risks,  and

other risk categories.  Include different risk handling categories (avoidance, mitigation, transfer, acceptance).
Include most of the following risk info for ea. risk: Title or description of item or TASK at risk; Description of the RISK; Risk category or type; Initial assessment

of Consequences, impact, or cost at risk; initial likelihood or probability; Initial risk score (consequence x likelihood); Risk handling CATEGORY; Risk handling /

control / mitigation / action PLAN; Designation of risk “owner.  Answer the majority of the questions.
To earn 60-69% of the points available for this assignment –
Identify at least 6 risks, including risks such as: the general ability to complete the project successfully; major tasks of different types and categories; sub-tasks

of different types and categories; lowest level leaf node tasks or sub-sub tasks of different types and categories. Include risks such as: external risks,  financial

risks,  organization risks,  PM risks,  quality risks,  technical risks,  and other risk categories.  Includes only one of the risk handling categories (avoidance,

mitigation, transfer, acceptance).
Include much of the following risk info for ea. risk: Title or description of item or TASK at risk; Description of the RISK; Risk category or type; Initial assessment

of Consequences, impact, or cost at risk; initial likelihood or probability; Initial risk score (consequence x likelihood); Risk handling CATEGORY; Designation of risk

“owner.  Answer the majority of the questions.
Less than 60% –
Risk Registers that do not meet the requirements will earn a zero.  WBSs that are not original work will earn a zero.

WhatsApp
Hello! Need help with your assignments?

For faster services, inquiry about  new assignments submission or  follow ups on your assignments please text us/call us on +1 (251) 265-5102

GRAB 30% OFF YOUR ORDER

X
GET YOUR PAPER DONE