For faster services, inquiry about  new assignments submission or  follow ups on your assignments please text us/call us on +1 (251) 265-5102

WhatsApp Widget

N5E22 Group Project

學生姓名 Student Name
聯絡電話 Contact Number
科目名稱及編號 Module Code & Name N5E22 Group Project
講師姓名 Lecturer Dr. Kwan
第一次上課日期 1st lesson Date 01/12/2018
派發日期 2nd lesson Date 08/12/2018
遞交期限 Submission Deadline 03/06/2019
功課交收紀錄
Assignment Submission Records
日期
Date
負責同事
staff signature
日期/題目
REDO Date/Remarks
(由導師填寫)
1/ Student – 1st Submission
2/ Lecturer – 1st Take Away
3/ Lecturer – 1st Marking Completed
4/ Student – 1st Take Away (Amendment)
5/ Student – 1st Amendment Completed
6/ Lecturer – 2nd Take Away
7/ Lecturer – 2nd Marking Complete
8/ Student – 2nd Take Away
9/ Student – 2nd Amendment Complete
10/ Lecturer – 3rd Take Away
11/ Lecturer – 3rd Marking Complete

 Assignment Soft Copy Email to 『 admin@tdpedu.org 』
All students are advised to keep a duplicate copy of all work submitted for reference.
Please keep this cover and any marked pages!

學生姓名
Student Name :
聯絡電話
Contact Number :
電郵地址
Email Address :
課程名稱
Program Name :
HND in Construction and the Built Environment
科目名稱及編號
Module Code & Name :
N5E22 Group Project
講師姓名
Lecturer :
Dr. Peter Kwan
第一次上課日期
1st lesson Date:
01/12/2018
派發日期
Issue Date:
08/12/2018
遞交限期
Submission Deadline :
03/06/2019
遞交日期
Submission Date :

功課交收紀錄 Assignment Submission Records
Attention





All assignments need to be submitted within 90days after distribution.
If needed, students can apply for a 30-day extension to the college’s staffs. (ONLY 1 extension per module)
Deferral application form should be handed in 10 days before deadline.
To be efficient, please keep this cover and the marked pages after amendment.
Late submission is not allowed. Any late submission will be charged HK$500 administration fee and students need to redo the new
term’s assignment in the next intake.
All assignments must be submitted in both hard and soft copies (USB).
No plagiarism is allowed. If there is any plagiarism found, we will follow the procedures stated in the admission pack. If you have any
enquiries, please feel free to contact our staffs.

Submission Requirement
Font Times New Roman
Font Size 12
Spacing Single Line Spacing
Margin 2 Centimetres (Left-side of page only)
Printing Single Sided with Page No.
Number of Words (Approx.) 7,500 words
學生 / 導師交回功課
Submission or Take Away
日期
Date
負責職員簽處
Staff Signature
1. Student – 1st Submission
2. Lecturer – 1st Take Away
3. Lecturer – 1st Marking Completed

For Assessor and IV to CHECK:

Page no. Unit Assessor to check Checked
(write it later) Assessor to check Student is answering generally to the
question points for each question
(write it later) Assessor to check Student answer is of 2.5 to 3 pages long each
(except maths)
(write later) Assessor given grade (Ps, or M1, M2, M3 or D1, D2, or D3) on
the last answer page, justifications for the grade, and
improvement advice (for L5/L6 only)
(write later) Assessor given regular comments on each page if not some of
the pages and not just at the last answer page
3-4 Assessor put grade on the grading page and give overall
comments for each criteria page
3-4 Assessor sign off and dated on the assignment page
5 Assessor sign off but do not date on the IV page
(write later) Internal Verifier (IV) to check Assessor (UA) all of the above
5 IV to put in the comments on the IV page, write the words for
Match, Accurate, Constructive and No change of grades and
general feedback to the UA
5 IV to put his name, sign and date
Assessor’s comments
Qualification HND in Construction and
the Built Environment
Assessor
name
Dr. Peter Kwan Second Assessor
Unit number N5E22 Learner name
Assignment
title
Group Project

Marking *FOR REFERENCE ONLY

LO
1 P1 P2
Comment:
2 P3 P4
Comment:
3 P5 P6 P7
Comment:
4 P8 P9
Comment:
MERIT M1 M2 M3 M4
Comment:
DISTINCTION D1 D2 D3
Comment:
*Please  below if achieved.
Overall Grade
Marker Signature
* Grading will not be accepted if there is no signature by the Marker.
Grading criteria Achieved?
Learner feedback
Assessor feedback
Action plan
Assessor signature Date
Learner signature Date

INTERNAL VERIFICATION – ASSESSMENT DECISIONS

Award HND in Construction and the Built
Environment
Assessor Dr. Peter Kwan
Unit(s) Unit 22 Group Project
Assignment title: Group Project
Learner’s name:
Which criteria has the assessor
awarded?
Pass Merit Distinction
Do the criteria awarded match
those targeted by the
assignment brief?
Y/N*
Details
Has the work been assessed
accurately?
Y/N*
Details
Is the feedback to the learner:
 Constructive
 Linked to relevant grading
criteria
 Identifying opportunities
for improved performance
Y/N*
Details
Does the grading decision need
amending?
Y/N*
Details
Remedial action taken:
Internal Verifier name
Internal Verifier signature Date
Confirm Action completed
Assessor signature
Internal verifier signature
Assignment front sheet
Learner name Assessor name
Dr. Peter Kwan
Date issued Completion date Submitted on
08/12/2018 03/06/2019
Qualification Unit number and title
HND in Construction and the Built
Environment
N5E22 Group Project
Assignment title N5E22 Group Project
Criteria
reference
To achieve the criteria the evidence must show that
the student is able to:
LO no. Evidence
P1 Evaluate own skills and the skills of others through skills
auditing and review.
LO1
P2 Develop role descriptions and responsibilities within a
team.
LO1
P3 Develop a project plan to ensure successful
achievement of completed project.
LO2
P4 Illustrate resource planning (both physical and human)
as well as time planning.
LO2
P5 Develop construction drawings and specifications. LO3
P6 Prepare a cost plan. LO3
P7 Produce a pre-construction health & safety method
statement.
LO3
P8 Undertake a continual review of their own work,
recording this throughout the project.
LO4
P9 Evaluate their own working practices in relation to that
of other members of the team, identifying areas of
good practice.
LO4
M1 Discuss the allocation of roles within a collaborative
team to meet overall project needs.
LO1
M2 Interpret events and activities in a project plan in order
to indicate milestones, and risks.
LO2
M3 Evaluate the ways in which Building Information
Modelling can provide greater efficiency in collaborative
preparation of tender documentation.
LO3
M4 Evaluate their own personality profile in relation to your
working practices.
LO4
D1 Justify the allocation of roles and responsibilities within
a team, recognising individual skills and ambitions vs
project requirements.
LO1
D2 Critically evaluate the relationships between project
planning and tender documentation, highlighting ways
in which tender information responds to project
planning.
LO2
LO3
D3 Critically evaluate the success of a project by
considering individual and group working practices in
relation to assigned roles and personality profiles.
LO4
Learner declaration
I certify that the work submitted for this assignment is my own and research sources are
fully acknowledged and agreed that once successfully submitted to Hong Kong College of
Engineering, it is deemed the property of Hong Kong College of Engineering.
Learner signature: Date:

Higher Nationals
Assignment Brief – BTEC (RQF)
Higher National Diploma in Construction and the Built Environment (Surveying) /(Civil
Engineering) / ((BSE – Air Conditioning) / (BSE – Electrical)

Student Name /ID Number
Unit Number and Title N5E22 Group Project
Academic Year 2018.12
Unit Assessor Dr. Peter Kwan
Assignment Title N5E22 Group Project
Issue Date 08/12/2018
Submission Date Deadline : 03/06/2019
IV Name Mr. Wallace Chan
Date
Assignment Brief and Guidance:
Assuming you are a team of 3 to 4 graduate engineers and you are being asked to form
a project team to work on a project of your choice. You should work professionally
and coordinate and communicate as far as real engineers in the construction industry
in HK.
Unit Learning Outcomes:
LO1: Assess individual and group skills in order to allocate roles within a collaborative
team.
Evaluate everyone own skills and discuss through self-auditing or brain storming and
review. Highlight each person’s strength and weakness.
Develop role descriptions and responsibilities with your own team of 3 to4 within your
own team. That is to find out what needs to be done in a project selected by the team.
Discuss the allocation of roles among the team for the selected project of the group
choice. It can be a design, construction or a maintenance project but can be complete
within 3 to 6 months. (M1)
Justify the allocation of roles and responsibilities within your team, recognizing
individual skills and goals against project requirements of your selected project. (D1)
LO2: Plan a construction project, based on the Pearson-set theme, in collaboration with
others to ensure good practice in resource management, staffing and project
scheduling.
Develop a project plan to ensure successful completion of the project. This project
management plan shall be in the form of a bar chart of activities.
Illustrate the resources planning including the human, equipment and put them into
the time programme or plan.
Interpret and explain the events and activities in this project plan and indicate the
milestones and risks. (M2)
Assignment Brief and Guidance:
Now your team is more familiar with each other, and is working towards the tender
stage under a tight schedule. Your manager has asked your team to speed up the work.
So have regular discussion meetings and act towards the common goals for the
following tasks.
LO3: Prepare tender documentation; undertaking work appropriate to a defined role
within a team.
5. Develop the construction drawings and write up the project construction
specifications. So it is better a construction project.
6. Prepare a cost plan for the project. You may also depict for a cash flow analysis for
the entire project duration.
7. Produce a pre-construction health & safety method statement.
Evaluate the different ways in which BIM can provide greater efficiency in collaborative
preparation of tender documentation. (M3)
Evaluate critically the relationships between project planning and tender
documentation. Highlight different ways in which tender information responds to
project planning. (D2)
LO4: Evaluate own work, and the work of others, in a collaborative team.
8. Undertake a continual review of their own work and record throughout the project.
9. Evaluate their own working practices in relationship to that of other members.
Identifying areas of good practice.
Evaluate their own personality profile in relationship to your working practices. (M4)
Critically evaluate the success of a project by considering individual and group working
practices in relationship to assigned roles and personality profiles. (D3)
WhatsApp
Hello! Need help with your assignments?

For faster services, inquiry about  new assignments submission or  follow ups on your assignments please text us/call us on +1 (251) 265-5102

We accept Cash App, Zelle, Apple Pay, Google Pay, and Stripe. Contact support for more info!Submit Your Questions to Writers for FREE!!

X
GET YOUR PAPER DONE