Piping system layout

  1. Avoid pipe velocities in excess of 10 ft/s.
  2. Provide valves to isolate each pump (items 1 and 2 may do the job) and the chiller.
  3. All pipes are to be schedule 40.

The following are needed:

  1. Sketch of the actual piping system layout.
  2. Schematic of the Hardy-Cross arrangement with all pipes and loops identified.
  3. Diameters and lengths of all piping required. (To reduce complexity, a minimum of three pipe sizes can be specified. Supply and return lines can be a single diameter, piping on the fourth floor can be a single diameter, and piping on the remaining four floors can be a single diameter.)
  4. Description (type) and location of each valve.
  5. List of materials (diameters, lengths, valves, … ) required.
  6. Increase in head and flow rate of all pumps required to balance the system for the specifications.
WhatsApp
Hello! Need help with your assignments?

For faster services, inquiry about  new assignments submission or  follow ups on your assignments please text us/call us on +1 (251) 265-5102

🛡️ Worried About Plagiarism? Run a Free Turnitin Check Today!
Get peace of mind with a 100% AI-Free Report and expert editing assistance.

X